previous section: 6/8 page: 2/2 next

6Screw insertion

Insertion of the second lag screw

Insertion of the second lag screw

Insert the second lag screw following the same steps as for the first lag screw:

  1. Drill the gliding hole with a 4.5 mm drill bit and drill guide as perpendicular to the fracture plane as possible.
  2. Insert the 4.5 mm / 3.2 mm drill guide into the gliding hole.
  3. Drill the thread hole with a 3.2 mm drill bit.
  4. Countersink the near cortex.
  5. Measure for length.
  6. Tap the thread hole with a 4.5 mm tap.
  7. Insert the screw.