page: 1/3 next

Fixation

Plate position

Position a four-hole, one-third tubular plate firmly by hand so that two holes lie superior and two holes lie inferior to the fracture line. Plan to position the first proximal screw near the fracture.

This screw must be located in the tibia, 3 mm proximal to the apex of the fracture.